The varied and challenging sub-soil issue and uncontrolled design method frequently cause defects in piles. This paper identifies the cause of defects and indicates top quality Command actions for bored cast-in-situ piles. Demolition of the surplus concrete over the Slash-off level shall be completed by operatives working with jackhammers. Bored https://franciszeky528qua8.blogchaat.com/profile